Preparation before the installation of industrial sliding doors

    The industrial sliding door consists of multiple components, including motor motors, electric boxes, door panels, transparent windows, and so on. The quality of the product is not only the quality of the product itself, but also has a certain impact on the installation of good or bad. Only good installation can make the product longer and more stable. You can effectively avoid the occurrence of small problems during installation before installation. 

     Preparation before the installation of industrial sliding door

     1. The installer should be familiar with the installation drawings before installation, check whether the lines of the door are in place, and make other installation preparations, including parts and tools that need to be used.

     2. The process process is roughly divided into: hole processing, bullet line, fixed roll transmission device, air load test car, curtain board, installation guide rail, test car, cleaning.

     3. Cave entrance treatment: Rating the opening of the hole in accordance with the product size. Generally, the width and height of the hole should not be greater than 5m. Review the location and quantity of the embedded parts.

     Bullet line: measure the elevation of the hole in the hole, pop up the two -guide track vertical and the center line of the roller

     After the preparation is done, pay attention when installing when the entrance of the wall is concrete, the embedded parts should be buried in the entrance of the cave, and then welded with the guide rail and bearing frame; The hole is buried in an anchor bolt and connected to the guide rail and bearing frame.